Aftercare

Solar panel maintenance and aftercare: what to expect

Solar panels have no moving parts and need little day-to-day attention, but a system that's left entirely alone can lose output without anyone noticing. Good aftercare starts at handover, with the right documents and a clear idea of who to call.

Checked at source on 3 November 2026 · Published by SEO-DONS LTD

Handover

What a proper handover includes

The MCS Customer Commitment is specific about handover. The installer should demonstrate how the system works and explain its key parts; show you how to set it up and use it; agree with you the most effective way to control it for your needs; check you're happy with the work; and agree a date for anything still to be done.

You should also be left with a handover pack containing, as a minimum, a list of key parts, health and safety guidance, a recommended servicing and maintenance schedule, the manufacturers' instruction manuals, and all relevant guarantees and warranties. The installer should explain what any guarantees and warranties cover, whether you need to do anything to keep them valid, and how to contact them if something goes wrong.

Then, within 30 calendar days of completion: the MCS certificate, any building regulations compliance certificate, and proof of network notification or approval where it was needed.

Maintenance

Looking after the system

Follow the maintenance schedule in your handover pack; it's specific to the equipment you have. Beyond that, the most useful habit is checking the system's output. Most inverters have a display or an app showing generation. A sudden drop, a fault light or an error code is worth a call to the installer.

Compare each month's generation with the same month the year before, rather than with the previous month, because output follows the seasons. If the totals fall well short of the performance estimate over a whole year, ask the installer to check the system.

Don't go on the roof yourself. Panels can need cleaning where dirt or bird droppings build up, but working at height is dangerous; ask the installer for advice first, and check the manufacturer's instructions in your handover pack for how panels may be cleaned.

Warranties

The warranties you should have, and who gives them

WarrantyGiven byCoversWhat to keep
Panel product and performanceThe panel manufacturerDefects, and output over time, on the manufacturer's termsThe warranty document and panel model
InverterThe inverter manufacturerInverter faults, usually for a different period from the panelsModel and serial number; registration if required
Battery (if fitted)The battery manufacturerDefects and capacity, on its own termsThe warranty and any usage conditions
WorkmanshipThe installerProblems caused by incorrect installation; at least two years for RECC membersThe contract and warranty terms
Financial protectionThe installer, as a RECC requirementPutting things right if the installer can't or stops tradingThe protection certificate

Scam warning

"Your solar warranty has expired"

In June 2025 MCS warned that people were receiving text messages, with the sender shown as "MCS", saying their solar warranty had expired and asking them to call a number to renew it. The texts weren't from MCS, and the number had nothing to do with it. MCS also warned about a company falsely presenting itself as linked to MCS, contacting people by text, email and phone to sell maintenance and warranty packages.

MCS says the only website linked to it is mcscertified.com, and suggests forwarding spam texts to 7726, following Ofcom's advice. If you're unsure whether a message about your system is genuine, contact your installer using the details in your own paperwork, not those in the message. Citizens Advice can help if you think you've been scammed.

When there's a fault

Who to contact, in order

  1. Your installer. The handover should tell you how. Explain the problem and what you'd like to happen.
  2. MCS, if the installer doesn't resolve it. MCS suggests 14 days as a reasonable maximum for the installer's response, and acts as a single point of contact for complaints about certified installations.
  3. Independent dispute resolution, if the MCS process doesn't settle it. RECC members' customers can use a dispute service at no cost.

If the installer has stopped trading, the financial protection behind a consumer code's workmanship warranty is designed for exactly that situation. See when something goes wrong.

Paperwork that pays

Keep the documents for the system's life

The MCS Customer Commitment asks customers to keep installation documents for the lifetime of the system. The MCS certificate is what an energy supplier needs before paying for exports under the SEG. The warranties are what you'll need if a part fails. And the whole set, with the network paperwork and any building regulations certificate, is what a buyer's solicitor will ask for when you sell. Keep them together, and keep a copy somewhere other than the house.

Quick answers

Aftercare questions

Do solar panels need maintenance?

Less than most home systems, but some. Your installer’s handover pack should include a recommended servicing and maintenance schedule; follow it, and keep an eye on the inverter’s display or app for faults.

What should be in the handover pack?

Under the MCS Customer Commitment: a list of key parts, health and safety guidance, a servicing and maintenance schedule, the manufacturers’ manuals, and all guarantees and warranties.

I got a text saying my solar warranty has expired. Is it real?

Be very careful. MCS has warned about texts with the sender name "MCS" saying a solar warranty has expired. They are not from MCS. Check with your installer directly, using details from your own paperwork.

Who do I call if the system stops working?

Your installer first; the handover should tell you how to contact them if anything goes wrong. If a problem isn’t resolved, MCS handles complaints about certified installers.

Sources for this page

Ready for a solar panel quote?

Tell us about the house and the roof, and what you would like priced: panels, a battery or both. If an installer has already quoted, add the system size and the price. Your details reach SEO-DONS LTD, which runs Solar Panel Installers, and we reply by email.

What happens next

  1. Your details go to SEO-DONS LTD, the company that runs Solar Panel Installers.
  2. We read what you have told us about the house and reply by email.
  3. Asking for a quote costs nothing and puts you under no obligation.
Add more about the house, or a quote you hold (optional)

Published by SEO Dons Ltd. We don't install panels ourselves. We reply by email. See our privacy notice.

Get a solar quote
Get a solar quote