Guide · equipment
Reading the kit list on a solar panel quote
Every solar quote lists equipment, and the names can be hard to compare. This guide explains what each part is and what the quote should tell you about it. It doesn't recommend brands: the right products depend on your roof, your use and the installer's design.
Checked at source on 3 November 2026 · Published by SEO-DONS LTD
Panels
Panels and system size
Each panel has a power rating in watts, measured under standard test conditions. Multiply by the number of panels and you have the system size in kilowatts peak, kWp. Two quotes might reach the same kWp with fewer, higher-rated panels or more, lower-rated ones; on a small roof, higher-rated panels can fit more capacity in.
What the quote should show: the make and model, the rating of each panel, the number of panels, and the total kWp. Ask for the datasheet if it isn't attached, and for the manufacturer's product and performance warranties.
Rating isn't output. What a system actually generates depends on the roof's direction and pitch, shading and the weather, which is why the performance estimate matters more than the headline kWp. See performance estimates.
Inverters
String inverters, microinverters and optimisers
A string inverter is a single box, usually indoors, that converts the direct current from a string of panels into household alternating current. It's the most common arrangement on domestic roofs.
Optimisers are small units fitted behind individual panels, working with a compatible inverter, so that a shaded or underperforming panel affects the others less. Microinverters go further, converting each panel's output on the roof. Both can help on shaded or complex roofs, at extra cost; ask why they're proposed for yours.
A hybrid inverter can manage a battery as well as panels, now or later. If you might add a battery, ask whether the proposed inverter allows it.
What the quote should show: the inverter's make, model and rating, where it will be installed, and its warranty, which is usually separate from the panels'.
The list
Kit list terms, and what to ask
| Term | Means | Ask |
|---|---|---|
| W (panel) | A panel's rated power under standard test conditions | Make, model, number of panels |
| kWp | The system's total rated power | Does the estimate use this size? |
| String inverter | One converter for a string of panels | Where will it go? Warranty? |
| Optimiser | Per-panel unit reducing shade losses | Why is it needed on my roof? |
| Microinverter | Per-panel converter on the roof | How is a failed unit replaced? |
| Hybrid inverter | Inverter that can manage a battery | Can a battery be added later? |
| Usable capacity (kWh) | Energy a battery can actually deliver | Is the quoted figure usable or nominal? |
| Isolator | A switch to make the system safe | Included in the electrical work? |
| On-roof / in-roof | Mounted above the tiles, or replacing them | Effect on the roof and its warranty |
Batteries
If a battery is on the list
A battery's capacity is given in kilowatt-hours. The important figure is usable capacity, the energy it can actually deliver, which is usually less than the nominal figure. The MCS Customer Commitment requires storage capacity, where applicable, to be stated in the contract; make sure it's the usable figure.
Battery storage is a separate MCS technology, so check the installer is certified for it as well as for solar PV. Adding a battery can also change the network route: panels and a battery on the same connection add together, and MCS notes the combination will often need a G99 application. Installed batteries in homes are zero-rated for VAT until 31 March 2027, like the panels.
Comparing kit
How to compare two different kit lists
Brands and models differ between quotes, and that's normal. Rather than trying to rank brands, ask each installer the same questions: why these panels for this roof, why this inverter type, what are the product warranties, and who handles a warranty claim. A clear, specific answer is a good sign; a vague one, or pressure to choose a "premium" option without a reason, isn't.
If an installer changes a product after you've signed, the MCS Customer Commitment says you must get a written variation, and if the change is significant, the choice to cancel. See contracts and variations and what gets installed.
Mounting and roof
The parts you won't see on the brochure
The mounting rails, roof hooks and fixings rarely get a line of their own on a quote, but they hold everything in place for the life of the system and they're what passes through or under your roof covering. Ask what fixing system will be used, how it's weatherproofed on your roof type, and whether bird protection is included around the panel edges. On slate, tile and flat roofs the answers differ, and a good installer will explain theirs.
Monitoring
Displays and apps
Most inverters show generation on a display or through an app. Ask whether monitoring is included, whether it needs your home internet connection, and whether it shows faults. Monitoring is the easiest way to spot a problem early, so make sure it is set up and working before the installer leaves, and that you know how to read it.
If a battery is included, ask how its charging can be controlled, and whether that depends on the app or the manufacturer's online service continuing to work.
Write down the serial numbers of the inverter and any battery when they're installed, or ask the installer to include them in the handover pack. Some manufacturers ask for products to be registered for the full warranty, and the serial numbers are what any later claim will need.
Keep the datasheets too: they're the quickest way to answer a question about your system years from now.
Sources for this page
- MCS — The MCS Customer Commitment, version 1.1 (8 September 2026) read 3 November 2026
- MCS — Installer Operating Requirements, Issue 2.0 (September 2026), PDF read 2 November 2026
- MCS — guidance on notifying network operators (G98 and G99) read 3 November 2026
- HMRC — VAT Notice 708/6, energy-saving materials read 3 November 2026
Ready for a solar panel quote?
Tell us about the house and the roof, and what you would like priced: panels, a battery or both. If an installer has already quoted, add the system size and the price. Your details reach SEO-DONS LTD, which runs Solar Panel Installers, and we reply by email.
What happens next
- Your details go to SEO-DONS LTD, the company that runs Solar Panel Installers.
- We read what you have told us about the house and reply by email.