Guide · permissions
Solar panels: planning permission and building regulations
Two separate systems can apply to a home solar installation, and they're often confused. Planning is about whether the panels are allowed where they'll go. Building regulations are about whether the work, the electrics in particular, is done safely. You may need to satisfy both.
Checked at source on 3 November 2026 · Published by SEO-DONS LTD
Planning
Permitted development for home solar
The Planning Portal explains that installing solar panels and equipment on residential buildings and land may be permitted development, with no need to apply to the local authority for planning permission. There are important limits and conditions that must be met to rely on it, and the Portal suggests checking with your local planning authority if you're unsure whether they will all be met.
The conditions are about where and how the panels sit: how far they project from the roof, whether they go above the highest part of the roof, and extra restrictions on walls facing a road in some protected areas. Listed buildings, and homes in conservation areas or other designated land, are where permitted development is most limited, and where a conversation with the planning authority before signing is most worthwhile.
The Planning Portal covers England and Wales. Scotland and Northern Ireland have their own rules.
England from August 2026
The 2026 changes in England
New permitted development rules for solar in England came into force on 27 August 2026. They widen what can be done without a planning application to include panels on flats, wall and balcony panels within set projection limits, plug-in solar, and stand-alone panels of up to 9 square metres, with a transitional period running to 26 August 2027.
Each new right comes with its own conditions, so the change doesn't mean anything goes. If your plans rely on one of them, ask the installer which right applies and what its conditions are, and check the legislation or your planning authority if you're in doubt.
Building regulations
Building regulations and competent person schemes
Building regulations cover how work is carried out: structure, electrical safety, fire safety and more. GOV.UK points out that building regulations approval is different from planning permission, and that you might need both. For a solar installation, the electrical connection is the part most often covered, and the roof structure must be able to take the extra load.
You don't have to get approval yourself if the work is done by someone registered with a competent person scheme. Members of those schemes can self-certify that their work complies, and you should receive a compliance certificate. Otherwise the work needs approval from a building control body.
An MCS installer must explain what must be notified under building regulations and who is responsible, and give you any building regulations compliance certificate within 30 days of completion.
Side by side
Planning and building regulations compared
| Planning | Building regulations | |
|---|---|---|
| About | Whether the panels may go there | Whether the work is done safely |
| Usually | Permitted development, with conditions | Self-certified by a competent person scheme member |
| Take care if | Listed building, conservation area, flat | Installer isn't in a relevant scheme |
| Evidence to keep | Any confirmation from the planning authority | The compliance certificate |
Whose job
Who should handle what
The MCS Customer Commitment asks installers to tell you all the permissions, approvals and licences needed before you sign, and to explain what has to be notified under building regulations and who does it. It also asks customers to make sure the necessary permissions are in place. In practice, a good installer will tell you whether permitted development applies and handle the building regulations side; if planning permission is needed, agree in writing who applies and who pays.
If you're a leaseholder, or the home is in a block, you may also need the freeholder's consent, which is separate from planning. If you rent, the landlord's consent is needed.
The roof
Roof warranties and structure
Two roof questions sit between planning and building regulations. Can the roof structure take the panels? The survey should look at the rafters and the loft. And will the installation affect an existing roof warranty, such as on a recently re-roofed house? An MCS installer must tell you in writing if the installation might invalidate an existing warranty, and get your written permission before going ahead.
See the site survey and what gets installed.
Keep any planning confirmation and the building regulations compliance certificate with the MCS certificate. When you sell, the buyer's solicitor will usually ask for evidence that the panels were installed lawfully and that the electrical work was certified, and having both to hand avoids delays at the point you can least afford them.
Special cases
Flats, listed buildings and conservation areas
Flats. Until the 2026 changes in England, panels on flats generally needed planning permission. The new rights widen what's possible, with conditions, but a flat also brings the freeholder's consent and, often, the other leaseholders' interests in the roof.
Listed buildings. Listed building consent is a separate requirement from planning permission, and work without it can be an offence. Speak to the local planning authority before agreeing anything.
Conservation areas and other designated land. Permitted development rights are narrower. Panels visible from the road may need permission.
Asking the council
When to talk to the planning authority
If you're unsure whether permitted development applies, the Planning Portal suggests checking with your local planning authority. Many authorities offer advice, sometimes for a fee, and some will confirm in writing that a proposal doesn't need permission. For a straightforward roof on an unlisted house outside protected areas, most installers will be able to tell you that no application is needed and why; ask them to put the reason in writing.
Sources for this page
- Planning Portal — solar panels and planning permission read 3 November 2026
- legislation.gov.uk — SI 2026/896, permitted development for solar in England read 2 November 2026
- GOV.UK — building regulations approval: when you need it read 3 November 2026
- GOV.UK — competent person schemes read 3 November 2026
- MCS — The MCS Customer Commitment, version 1.1 (8 September 2026) read 3 November 2026
Ready for a solar panel quote?
Tell us about the house and the roof, and what you would like priced: panels, a battery or both. If an installer has already quoted, add the system size and the price. Your details reach SEO-DONS LTD, which runs Solar Panel Installers, and we reply by email.
What happens next
- Your details go to SEO-DONS LTD, the company that runs Solar Panel Installers.
- We read what you have told us about the house and reply by email.
- Asking for a quote costs nothing and puts you under no obligation.